Each of the regeneration options involve different processes, so will progress at different rates. Retrofit strategies will require extra time, to factor in in-depth surveys and assessment of the existing buildings, before the design can progress.

Timeline for full redevelopment

  1. Site evaluation and brief development
  2. Develop new build massing studies (we are at this stage)
  3. Detailed design and coordination
  4. Technical design and specifications
  5. Construction and handover

Read more about consulting with residents and the local community.