Each of the regeneration options involve different processes, so will progress at different rates. Retrofit strategies will require extra time, to factor in in-depth surveys and assessment of the existing buildings, before the design can progress.
Timeline for full redevelopment
- Site evaluation and brief development
- Develop new build massing studies (we are at this stage)
- Detailed design and coordination
- Technical design and specifications
- Construction and handover
Read more about consulting with residents and the local community.